The Journal of Dam Safety

ASDSO's Journal of Dam Safety, first published in Spring 2003, provides opportunities to share lessons learned and technology related to dams and levees. The Journal is published quarterly in March, June, September, and December.

Each issue includes technical and/or policy articles (typically three), a training calendar, and a summary of recent dam safety news and events.

Subscription to the Journal of Dam Safety is one benefit of ASDSO membership. Non-members can subscribe by calling 855-228-9732 or emailing info@damsafety.org.

Full issues and individual articles from the Journal (ISSN 1944-9836) are available through the ASDSO Bookstore.

In the Latest Issue (V11 n4, 2013)

Selecting and Accomodating Inflow Design Floods for Dams: Beyond the Guidelines
By Gregory L. Richards, Amanda Hess, Paul Schweiger, James Demby, and Arthur Miller

The main objectives of these updated guidelines are to recommend appropriate procedures for selecting and accommodating IDFs based on current and accepted practices, and to encourage uniform standards or criteria for public safety among state and federal agencies.

Seismic Upgrades for Concrete Dams – Then and Now
By Ken Hansen and Larry Nuss

Case studies for eight concrete dams (Bear Valley Dam, Gibraltar Dam, Stewart Mountain Dam, Littlerock Dam, Weber Dam, Stony Gorge Dam, Seymour Dalls Dam, Big Tujunga Dam) that were analyzed and subsequently modified are studied herein. Some of the more recent case studies presented used the PFMA and a risk analysis method in their decision to modify the dam.

A New Grading Methodology for Dams
By James MacLellan

The Mississippi Dam Safety Program has been working on a system for developing an overall rating or grade for the physical condition of its dams. This article presents the methodology developed by Mississippi to quantify these grades and to provide an overall assessment of dams in the state.

Submittal Guidelines

  1. Submitted manuscripts must not have been published as copyrighted material by any entity other than ASDSO, nor may they be submitted for consideration for publication as copyrighted material by any entity aside from ASDSO while in review for the Journal of Dam Safety. Exceptions may be granted, provided that an author whose paper has been previously copyrighted by another periodical or journal has secured copyright clearance, including associated fees, prior to submitting the paper.
  2. Technical articles should be 8 to 10 pages in length (single-spaced) including graphics and photos.
  3. Submit draft papers at least two months prior to the final article due date in MS Word format with photos and figures included in the paper.
  4. One ASDSO State representative and one ASDSO Affiliate Member Advisory Committee member will review each draft paper for content and scope. Their comments will be returned to the author(s) for consideration in preparing the final paper.
  5. Following editorial committee review, authors submit:
    1. Final papers in MS Word 2000 (or higher) format, including in-place photos and drawings and metric (SI) equivalent units in parentheses following English unit values;
    2. Photos and graphics in separate jpg, tiff, ep, or pdf format files of at least 300 dpi. (CMYK preferred, high-resolution RGB acceptable);
    3. A short one-paragraph bio, digital photo and contact information for each author.

Abstracts of 1/2 to 1 page may be submitted to mhogle@damsafety.org.

Download guidelines

Editorial Committee

Craig Findlay, Co-Editor
Findley Engr, Inc.
70 Old Field Road
Yarmouth, ME 04096
Phone: 207-846-1465
Fax: 207-846-3434

Mark Schultz, Co-Editor
CA DWR Divion of Safety of Dams
2200 X Street, Suite 200
Sacramento, CA 95818
Phone: 916-227-4619
Fax: 916-227-4500

Lyle Bentley
Chief, Dam Safety Program
Tennessee DE&C
6th Floor, L&C Tower
401 Church St.
Nashville, TN 37243-1539
Phone: 615-532-0154

John W. France
Senior Principal
URS Corporation
8181 East Tufts Avenue
Denver CO 80237
Phone: 303-740-3812
Fax: 303-694-3946

James W. Gallagher
Chief Water Res. Engr.
NH DES Dam Bureau
6 Hazen Drive
P.O. Box 95
Concord, NH 03302-0095
Phone: 603-271-1961
Fax: 603-271-2982

Michele Lemieux
Dam Safety Program Manager
MT DNRC
1424 9th Avenue
P.O. Box 201601
Helena, MT 59620-1601
Phone: 406-444-6613

Art Miller
Distinguished Professor-PSU
AECOM
315 S. Allen Street, Suite 121
State College, PA 16801
Phone: 814-571-6112
Fax: 814-253-1495

Bill Sturtevant
Dam and Floodplain Section
WI DNR
GEF 2, WT/6
101 S. Webster
Madison, VI 53707-7921
Phone: 608-266-8033
Fax: 608-267-2800

James Weldon
Dam Safety Engineer
Denver Water Department
1600 West 12th Avenue
Denver, CO 80204
Phone: 303-628-6657
Fax: 303-628-6851

Advertising in the Journal of Dam Safety

Association of State Dam Safety Officials, 450 Old Vine St., Lexington, KY 40507 | 859/550-2788 | info@damsafety.org

Copyright © 2017. Association of State Dam Safety Officials. All Rights Reserved. Privacy Statement | Disclaimer
Site designed and programmed by Hammond Communications Group, Inc.